项目名称:省道S202线新沙洲渡口至小寄山公路序号1123456789101112131415161718192021222324252627282930313233343536合计579078.0063367.247718.1289.901478.8318.06471.84302.40951.04337.761015.92369.6039088.47650.241099.024.2930.063355.8552.342.394.003469.26141.76过渡段BT-114198.3289.9018.062.560.722.240.002.640.88140.042.8214.0930.06157.853.590.054.00103.5624.76下游端部152381868.08117.4231.9220.5236.4815.9647.8825.082722.3242.18535.42标准段Gr-B-4E515663367.241327.67360.92232.02824.96283.58850.74283.5830781.32476.93上游端部468395751.7233.7476.4449.1487.3638.22114.6660.065444.79128.31549.514.293198.0048.752.343365.70117.00S8-5-2横梁B01(kg)7第 1 页 共 1页立柱基础预埋螺栓(kg)25桩 号布置形式3长度(m)4处横梁B02(kg)6横梁B00(kg)8A型托架(kg)9A型防阻块(kg)10连接螺栓(A)(kg)11连接螺栓(B)(kg)12拼接螺栓(D)(kg)13垫圈(kg)14螺母(kg)15横梁垫片(kg)16立柱(kg)17柱帽(kg)18端头(kg)19反光膜(m2)20Ⅰ级钢筋(kg)21Ⅱ级钢筋(kg)22C20砼(m3)23沥青砂(m3)24预埋钢管(kg)26预埋钢板(kg)2725松木桥至新沙洲渡口编制:复核:审核:
因篇幅问题不能全部显示,请点此查看更多更全内容