其 他 直 接 费(%)
项目
12345678910
人工土方机械土方汽车运土人工石方机械石方高级路面其他路面构造物Ⅰ构造物Ⅱ隧道
冬季施工增加费2.053.140.560.440.6120.81.842.270.75
雨季施工增加费0.160.160.170.110.150.150.140.120.13
夜间施工增加费高原施工增加费沿海地区增加费施工辅助
费综合费 率0.890.490.160.850.460.80.741.3
3.13.790.891.41.222.951.683.264.312.33
0.350.35
1.561.23
04 表
间 接 费(%)
临时设施
费1.571.420.921.61.971.921.872.653.142.57
主副食运费补贴0.250.190.20.190.180.120.120.180.20.16
职工探亲路费0.10.220.140.10.220.140.160.290.340.27
职工取暖补贴0.170.440.410.170.350.250.240.360.410.28
企业管理工地转移
综合费 率费费
2.093.36
2.271.672.062.722.432.393.484.093.28
3.261.443.453.281.913.284.445.534.22
财务费用0.230.210.210.220.20.270.30.370.40.39
综合费率3.593.471.653.673.482.183.584.815.934.61